Divani Palace Acropolis

New construction of restaurant/terrace

In 2023, Granab had the privilege of supplying subfloor system to the Divani Palace Acropolis hotel in Athens.

Granab was installed in the restaurant and adjoining roof terrace. The S-7000N12 was chosen because it is an inorganic system that is not affected by weather or temperature.

The drawing of the Divani Palace Acropolis roof terrace

Om projektet:

  • Client: EA Group
  • System: S-7000N12

Gulvregelsystem brugt i projektet

Tags

  • Boliger / etageboliger
  • Træningsfaciliteter
  • Skole og omsorg
  • Lyd og arrangementer
  • Kommerciel
  • Andre / Øvrige

Do you want to work with us?

Contact our experienced sales representatives to find out more about our services.
Kontakte

Miljøcertificering

Granab arbejder aktivt for at reducere miljøpåvirkningen og har certificeringer, der bekræfter vores forpligtelse til bæredygtighed. Alle vores gulvstrøsystemer er også miljøvenlige produktdeklarerede (EPD).